Bedienungsanleitung
IE-CT Kabel- und Installationstester 3
Operating instructions
IE-CT Cable and Installation Tester 15
GB
IE-CT 8808420000
012005/50/01/BTR/899006-01
Weidmüller Interface
GmbH & Co. KG
Postfach 3030
32720 Detmold
Telefon +49 5231 14-0
Telefax +49 5231 14-2083
info@weidmueller.com
www.weidmueller.com
Przeglądanie stron 0
1 2 3 4 5 6 ... 14 15

Podsumowanie treści

Strona 1 - Operating instructions

BedienungsanleitungIE-CT Kabel- und Installationstester 3Operating instructionsIE-CT Cable and Installation Tester 15GBIE-CT 8808420000012005/50/01/BT

Strona 2

225.6 Extraneous Voltage (Error Code 1)The IE-CT resists to extraneous voltages (short time up to 100 V). If extraneous voltages should appearin the i

Strona 3

235.10 Wrong Wiring (Error Code 5)If the IE-CT detects wrong termintated conductors in an installation or cable the conductor LED (F) forthe respectiv

Strona 4

245.11 Switch Setting (Error Code 6)If the Selection Switches are not correctly set (C) on the IE-CT Mainframe, i. e. if the installation hasmore cond

Strona 5

25Green Numeric Error LED MeaningLED Displaydoes not 1 the respective LED extraneouslight flashes or lights voltagedoes not 2 all LED’s are off line

Strona 6

267. Intermittent contactIf you are operating a termination unit such as wall outlet, cable or adaptor where you supect anintermittent contact, IE-CT

Strona 7

279. Technical DataWeightIE-CT Mainframe approx. 185 g (with battery)IE-CT Test Box approx. 31 gDimensions IE-CT Mainframe (B x H x T) 70 mm x 140 mm

Strona 8

2KIHGFEDBCAJA = AnschlussleitungB = 7-SegmentanzeigeC = neun Einstellschalter (unter dem Schutzgummi)D = Ein-/Aus- und StarttasteE = RJ45-Anschlussbuc

Strona 9

15Contents1. Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Strona 10

161. IntroductionBy purchasing the installation tester IE-CT you have decided to opt for an easy and professional piece of test equipment that is easy

Strona 11

173. Features• Recognition and display of the most frequent installation errors: short circuit, line/wire interrupt, line/wire mistakes, split pair• S

Strona 12

184. Startup ProcedureBefore operation put in the 9 V block battery first.1. Unscrew the two screws on the bottom of the unit and take this part away.

Strona 13

195. Operation5.1 Connection to Test Installation LinesTo test an installed line plug one end of the installation line to the IE-CT Mainframe and the

Strona 14

20!If installation errors are detected the conductorLED (F) of the respective poles will light red andthe error code digit lights in the numeric displ

Strona 15

215.4 Line IdentificationThe IE-CT Mainframe recognizes up to nine different IE-CT Test Boxes. This feature allows the user torun installation tests a